01246 268678 sales@emeg.co.uk

Blackburn Depot

Sept 2016 - August 2017

£2.9 Million

Buckingham Group Contracting

Key Project Features

  • e-wash™ CWM
  • e-vac ™ CET & Tanking Water System
  • Fuel, Oil & Coolant System
  • e-mix™ AdBlue System
  • Apron Hot & Cold Water Points
  • Lighting
  • LV Distribution
  • Telecoms
  • Accommodation & Plantroom Fire Alarm
  • Access Control

Description of Project

The Northern Hub programme was developed to increase capacity, line speed and connectivity throughout the North West of England. Blackburn’s King Street Depot is a brand new depot that has been introduced to assist in accommodating the additional rolling stock. The project includes a 12-rotor brush e-wash™ CWM, e-vac™ automatic CET system, tanking water, fuel, oil, coolant and AdBlue storage and dispensing systems, hot & cold water points, sitewide M&E, telecoms, fire alarm, access control, CCTV and powerpoints.

Click to view video case study

Design Services Provided:

  • Site Surveys
  • Conceptual Design to ‘As Built’
  • e-wash™ CWM
  • e-vac™ CET & Tanking Water System
  • Fuel, Oil & Coolant System
  • e-mix™ AdBlue System
  • Apron Hot & Cold Water Points
  • Plantroom Domestics
  • Lighting
  • LV Distribution
  • Earthing & Bonding
  • Telecoms
  • Accommodation & Plantroom Fire Alarm
  • Access Control
Gallery – Click to View Images

View more case studies