Northampton Castle Station Redevelopment

March 2013 - October 2015

£1.998 Million

Buckingham Group

Key Project Features

  • HV/LV transformed power supply

  • Isolated Earthing & Bonding systems to new NWR standards

  • HVAC Services Systems

  • BMS Control Systems

  • Electrical Services Distribution Systems

  • Internal and External Lighting Systems
  • DALI Lighting Controls System
  • Self-Contained Emergency Lighting System
  • Intruder Alarm System
  • Disabled Refuge System

  • Piped Services Systems

  • Fire Protection System

  • Ventilation and Cooling Systems

Description of Project

A new ‘gateway’ station building and footbridge has been constructed to replace the existing

Station along with associated works including the demolition of the existing station. A partnership arrangement had been set up between Network Rail, London Midland and Northampton Council.

Design Services Provided

  • New Station building internal & external services to reflect Network Rail, London Midland vision.

  •  Integration and solutions for all M&E services and associated Telecoms & CIS supplies.

  • Full survey of existing services to allow efficient decommissioning of existing station building services.

  •  Coordination of reconstruction works for platform 1 – canopy removed as part of station demolition works.

  • Electrical Services for Footbridge – a single span bridge has been installed between platform 1 and 2 to replace the current footbridge.