Leyland Carriage Sidings

April 2016 - December 2016

£970,000

Buckingham Group / Network Rail

Key Project Features

  • Controlled Emission Toilets (CET)
  • Fuel, Oil and Coolant System
  • Power Points
  • Electrical Services Distribution Systems
  • External Lighting Systems
  • Lighting Controls System
  • Tanking Water

Description of Project

The Northern Hub programme was developed to increase capacity, line speed and connectivity throughout the North West of England. Leyland Carriage sidings is one of the four Network Rail owned depots to be upgraded in order to facilitate the maintenance and servicing of the additional rolling stock. The project includes M&E services on the service aprons to roads and the carriage cleaning roads.

Design Services Provided

  • Existing M&E Surveys
  • Conceptual Design To As Built
  • LV Distribution
  • Lighting
  • Earthing & Bonding
  • Fuel Dispenser
  • Fuel, Oil & Coolant System
  • CET & Tanking Water System