Neville Hill Depot – 850V Shore Supplies

 

November 2011 - June 2016

£687,000

Galliford Try / Network Rail

Key Project Features

  • 2000kVA 11,000/850V Transformer
  • 850V 3-Phase MCCB Switchboard c/w IT Earth Resistor
  • 5No 850V 1-Phase Lineside Pillars
  • 5No 850V 1-Phase Ground Boxes
  • 5No 850V 1-Phase Plug/Sockets
  • Shore Supply Control System
  • Earthing & Bonding

Description of Project

The project consisted of the removal & replacement of electrical distribution equipment & cabling relating to the existing 850V Shore Supply installation that was well beyond its usable life.

The installation generally comprised of new transformer, switchboard, lineside pillars, ground boxes, plug/sockets & all associated cabling.

Design Services Provided

  • Survey of existing electrical distribution
  • Designs produced using the design process as defined in NR/SP/CIV/003 Form 001 to 003
  • Design of new electrical distribution system to accommodate 5no new 850V Shore Supplies
  • Design of new UTX & troughing routes
  • Upgrade of the existing Earthing & Bonding system in accordance with NR/SP/ELP/21085
Gallery – Click to View Images

View more case studies

Blackpool Depot

Blackpool Depot         Key Project Features CWM Tanking Water Automatic Sanding System Controlled Emission Toilets (CET) Automatic Sanding System CWM installation with water recycling system   Description of Project The Northern Hub programme was developed to...

read more

Blackburn Depot

Blackburn Depot Key Project Features CWM CET & Tanking Water System Fuel, Oil & Coolant System Adblue System Apron Hot & Cold Water Points Lighting LV Distribution Telecoms Accommodation & Plantroom Fire Alarm Access Control Description of Project The Northern Hub...

read more